RBVBS
BOLT MANAGEMENT ·
CONNECTION ASSURANCE
· G(V,E)
CONNECTIONS LIVE
20%
of parts cause
80%
of building failures. Bolts are that 20% — not one goes unchecked.
every junction \u00b7 every grid \u00b7 every frame
checked before erection
CONNECTION GRAPH · G(V,E)
V — · E —
JUNCTION MAP · V → 3D GRID
GRID —
NEXT 3 BAYS · planning
0
BOLTS / JUNCTION
0
BOLTS / FRAME
0
BOLTS / BAY
Mapping
—
CONNECTION ASSURANCE
PRE-ERECTION
CRITICAL PATH · BOLT-GATED ERECTION
DAY 12 / 42
0
bolts consumed \u00b7 this lot
of 24,180 planned
0
M24 · 8.8 / 10.9
0
M20 · 8.8
0
M16 · 8.8
0
M12 · 8.8
CRITICAL PATH — frame can’t rise until its junction bolts are confirmed on site
AUTO-ALARM · SITE & PURCHASE
—
INTEGRATION · CLOSED LOOP
DESIGN — connections modelled
DETAILING — bolt BOM per junction
PURCHASE — grades & counts ordered
SITE — checked per frame
DISPATCH — kitted by bay
FEEDBACK